What sellers must do
Under the general binding rules, when you sell a property with a septic tank or treatment plant, you must tell the buyer about the system in writing. That includes what it is, where it is, where it discharges to, and how it has been looked after.
If your septic tank discharges to a ditch or stream, the rules say it should have been put right by now. In practice this often comes to light during a sale, so it’s far better to find out early than have it raised by the buyer’s side weeks into the process.
What the buyer’s side will ask
Expect questions from the buyer’s solicitor, surveyor and sometimes their mortgage lender:
- Is the property connected to the mains sewer? (The drainage search will show it isn’t.)
- What kind of system is it, and how old?
- Where does it discharge to: a drainage field, a ditch or a stream?
- When was it last emptied and serviced? Are there receipts?
- Does it meet the general binding rules?
- Is it shared with neighbours? If so, who is responsible for what?
How to stop it delaying your sale
If you’re thinking of selling in the next year or so:
- Find out where your system discharges, and get it checked if you’re not sure
- Gather any paperwork: installation, emptying and servicing receipts, building regs approval
- Have it emptied and serviced before you go on the market
- If it doesn’t comply, get a quote to put it right, so you can either fix it or agree a price with the buyer
If you’re buying
A general building survey usually doesn’t look closely at drainage. If the house you’re buying has a septic tank, it’s worth paying for a specific drainage or septic tank survey before you exchange contracts. It tells you what’s there, what condition it’s in, and whether it meets the rules, so you know about any cost before you commit.
Who pays if it needs replacing?
There’s no fixed rule. It’s part of the negotiation. Sometimes the seller replaces the system before completion, sometimes the price is reduced, and sometimes money is held back until the work is done. Your solicitor can advise on the best way to handle it.
Common questions
- Do I need a septic tank survey to sell my house?
- It isn’t a legal requirement, but you must tell the buyer about the system in writing, and many buyers or lenders will ask for one. Getting a survey early can stop the sale being held up.
- Can I sell a house with a non-compliant septic tank?
- Yes, but the buyer needs to be told, and the system should be put right. Usually the seller fixes it before completion or the price is adjusted. It’s best to get a quote early so you know the cost.
- How long does a septic tank survey take?
- The visit itself usually takes a few hours. Most surveys can be booked within a week or two, and you get a written report afterwards.
Need help with your septic tank?
Free site visits and written quotes across Helston, Porthleven and the Lizard. Call 01326 469611 or send an enquiry.
This guide is general information, not legal advice. For the full rules, see GOV.UK or ask the Environment Agency.